West Bengal · east coast · Major Port
Kolkata Dock System (Syama Prasad Mookerjee Port)
3 of our truck hires touched this port in the last 12 months.
- 16.4 MT cargo handled million tonnes · FY2024-25
- #14 of 14 ports on our map #7 on the east coast
- -2.8% change on FY2023-24 16.9 MT the year before
- 3 SSL truck hires here Sep 2025 to Aug 2026
The port in numbers
16.4 million tonnes, FY2024-25
- Overseas 15.2 MT (92%)
- Coastal 1.3 MT (8%)
Our trucks
Our trucks at Kolkata
- 3Sep25
- 0Oct25
- 0Nov25
- 0Dec25
- 0Jan26
- 0Feb26
- 0Mar26
- 0Apr26
- 0May26
- 0Jun26
- 0Jul26
- 0Aug26
- Leaving the port 3 (100%)
- Going to the port 0 (0%)
Onward by sea
Routes from this coast
- Indian Ocean → Southern Africa19 to 34 daysto Durban · Cape Town
- Bay of Bengal → Southeast Asia7 to 17 daysto Singapore
Sea leg Booked by our desk
Frequently asked questions
How much cargo does Kolkata Dock System (Syama Prasad Mookerjee Port) handle?
Kolkata Dock System (Syama Prasad Mookerjee Port) handled 16.4 million tonnes in FY2024-25 (15.2 MT overseas and 1.3 MT coastal), -2.8% on the year before. Source: Ministry of Ports, Shipping and Waterways: 'Cargo handling status for Major Ports during March 2025', Table-1 (PDMP advance estimates for April-March 2024-25; 2023-24 provisional).
Does Safe & Secure Logistics run trucks to Kolkata?
Yes. From Sep 2025 to Aug 2026 our hire slips show 3 truck hires to or from Kolkata. 3 left the port and 0 went in. The inland ends were mostly Varanasi, Jamshedpur.
Which sea routes start from the east coast?
Indian Ocean → Southern Africa: about 19 to 34 days; Bay of Bengal → Southeast Asia: about 7 to 17 days (published port-to-port estimates).
Moving a container through Kolkata?
Port, container size and inland address, that’s all we need to start.